PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at the 1st floor rooms along South Elevation.jpg Core Drilled at Stair -2.jpg Door frame at the 2nd floor UCIA Room 217 Facing South.jpg Door Frames at the 2nd floor UCIA Rooms Facing South.jpg Installed concrete planks at the 2nd floor Facing West.jpg Installed pipe hangers at the 4th floor Facing East.jpg laying out block along column line 3.3 between H-K.jpg Laying out block at the 2nd floor UCIA Facing North.jpg STarted installing the main raiser at the 3rd floor Facing North.jpg
Previous pageNext page Installed concrete planks at the 2nd floor Facing West
Installed concrete planks at the 2nd floor Facing West